It can be daunting to tackle any kind of renovation, especially if you have never done it before. There are many trades to organize, materials to source, and a lot of planning to do. Budgeting is another important consideration.

 

Kitchen renovations without professional guidance can be difficult because of the variety of surfaces and fittings needed to make the space beautiful and functional. It is important to plan carefully as a mess or not being prepared for the next step could quickly cause financial problems and impact your ability to budget. How do you decide which element to prioritize?

Update your kitchen in just 10 steps

Although the details of your kitchen renovation will vary depending on its scope, there are some general guidelines that all kitchen remodels should follow. These are the ten steps by 7- Day Kitchen:

 

  1. The layout is the first step. Before you start any renovation, think about your goals. Consider how you live now, what works for you, and any other features that you want to be included in your final design.
  2. You need to choose your fixtures. The design of the fixture will be affected by the choice of appliances and materials. It is important that you make these decisions early in the design phase. These components can take up to a month to arrive so it is a good idea that you order them early.
  3. You can measure the space once you are satisfied. If you don't have the budget for a professional, you can do it yourself.
  4. Design: Consider how you will use the space, and what you want to store. The working triangle is no longer relevant, but it is important to consider how the layout can be made to work. You should also consider where you will store your items and how it fits into the overall design of your home. Engaging a professional kitchen designer is a great idea. This kitchen design guide is also available.
  5. Demolition: Once your kitchen is designed and organized, it's time to take out the old one. Take out everything you don't want to replace, and make the space ready for work.
  6. Floors, Doors, and Windows: Plastering, plumbing, and electrical are all required to install doors and windows. If your kitchen is changing in size, shape, or location, it's time to put in new structural elements. This includes installing new doors and windows, framing them up, and running the necessary electrical and plumbing. It is a good idea to do the flooring first before you start the kitchen. There are too many problems to leave until the end.
  7. Cabinetry: After the space has been cleared, you can install your cabinetry. The carcasses must be first installed, then the doors can be fitted later.
  8. Benchtop, sink, and tapware: You will need to cut your benchtop to fit your sink.
  9. Paint and tiling/splashback: After all your major elements have been in place, it's time to paint and tile/install your splashback.
  10. Lighting, cabinet doors, lighting, and shelving: The electrician and plumber will return to your project at the end, connecting your plumbing and installing your appliances. To finish the space, place your drawers and hang your doors on your cabinets. Finally, install any open shelving.

 

Need more information?

7 - Day Kitchen can help you if you are thinking of a kitchen remodel but don't know where to begin. Kitchen cabinet refacing company near me can help you design the space of your dreams. We also offer planning assistance so you don't have to worry about it.